After builders cleaning in Las Rozas: scope and timings

2026-11-14

A post-construction clean in Las Rozas covers everything the trades leave behind: fine plaster and silica dust on every surface, paint splashes on glass and tiling, adhesive residue on floors, and the grey film that settles again days after the builders have gone. The work is done top-down and room by room — ceilings and cornices, walls, joinery, kitchen, bathrooms, windows and frames, then floors — and finishes with a detail pass with you on site. A 90–110 m² flat normally takes one full day with a three-person team, or two shorter visits if snagging work is still going on; a 250–350 m² chalet on the north-western side of the municipality takes three to five days. Indicative pricing is €6–12/m² depending on dust and heights.

What is included, room by room

This is not a domestic clean done with more energy. The order matters: dry dust comes off first, with HEPA vacuums, so it is not smeared into wet surfaces and pushed into grout and silicone.

  • Ceilings, cornices, walls and skirting: vacuumed, then wiped, including the dust line above door frames that reappears the moment the heating goes on.
  • Paint, plaster and adhesive residue: removed from glass, frames, tiles, sockets and switch plates, with care on lacquered and matt finishes.
  • Kitchen: units inside and out, worktops, sink, extractor hood, and removal of protective film from appliances and panels.
  • Bathrooms: descaler on screens, taps and tiles, grout-haze removal on new tiling, sanitaryware cleaned, chrome polished dry.
  • Windows and shutters: glass, frames, tracks and sills, inside and out within safe reach.
  • Floors: vacuumed, then mopped or machine-scrubbed to suit porcelain, microcement, laminate or natural stone.
  • Detail pass: light fittings, handles, wardrobe interiors, terrace doors and a joint walkthrough before we leave.
  • Not included as standard: bagging and removal of builder's rubble and packaging — tell us at quote stage if you want it added.

How long the clean takes in practice

Most post-construction work splits into two visits rather than one. The first, heavier clean removes the bulk of the dust once the trades have finished plastering, tiling and painting: about a day for a 100 m² flat with three cleaners. The second, finer clean follows the snagging list and any paint touch-ups — half a day to a full day — and is best timed before the movers arrive rather than after.

Chalets in the north-west run longer per square metre, and not only because they are bigger. Double-height living rooms, glass staircases, wide sliding doors, terraces and pool surrounds all add access time, so a 300 m² property is realistically three to five working days with three or four cleaners on site.

Las Rozas conditions that change the schedule

Two local realities shape the job. The dry climate, combined with central heating switched on for the first winter, keeps fine dust airborne: it settles on surfaces cleaned an hour earlier, which is why floors are done last and why we suggest a light dust-down 24 to 48 hours after the main clean. Hard water in the region also leaves limescale quickly in new bathrooms, so screens, taps and grout get a descaler treatment rather than a general wipe.

The second is building management. Many communities here have a portero and set hours for noisy work, and lifts have to be protected or booked for moving materials and waste. That compresses the productive day, so plan for the same total hours spread over more days. We are also used to handing over in English for owners who are not on site, so the whole job — including the final walkthrough — can be managed in English.

Indicative cost and what moves it

As a guide, post-construction cleaning is €6–12/m² depending on dust and heights. A 100 m² flat with standard ceilings and moderate dust sits near the lower end, roughly €600–800 indicative; heavy plaster dust, double-height glazing, natural stone, external glass or a second visit after snagging push towards the upper end. Rubble removal, terraces and pool surrounds, and out-of-hours access are quoted separately. These figures are indicative and confirmed once we have seen the property or a clear set of photos.

Frequently asked questions

Should the clean happen before or after the snagging list is closed?

Ideally both. Do the heavy clean once the trades have finished, then a shorter fine clean after snagging and paint touch-ups. Cleaning before snagging saves a day; cleaning after it avoids dust settling on finished surfaces.

How soon after the builders leave can you start?

Usually within 48 to 72 hours, subject to lift availability and community work-hour rules. Book the slot before the final week of works so the date is held.

Can you clean only part of the property?

Yes. Kitchens and bathrooms only, glass and frames only, or floors only are all possible. Send photos and square metres through the quote form and we will price the partial scope.

Ready to schedule? Send the postcode, square metres and a few photos through our quote form for a price before the visit, book a date on the booking page, or read the full service detail for post-construction cleaning in Las Rozas. For this area call +34 911 67 75 72 or message us on WhatsApp.

See the service in las-rozas →